Air Handling Units
Access and Plinths
- General plant (including Air Handling Units, boilers, chillers, pumps etc.) must be:
- Installed with adequate access on sides with maintenance access panels for ease of service and replacement.
- Mounted on plinths (minimum 100mm in height) which is membraned and sealed as per figure below.
Vibration
- Air handling units and other general plant must be installed with approved vibration isolation from the structure on which they are mounted.